Showing posts with label 6-6-2017. Show all posts
Showing posts with label 6-6-2017. Show all posts

Tuesday, June 6, 2017

Site visit-Pre-bore bent 2



Arrow Drilling was onsite to Pre-bore holes for bent 2, work pad that contractor had built was too soft. contractor put down tree logs for drill rig to set on.



Driller was setup and started Drilling at 9:30, drill started hitting rock at the start and continued.



Coffer dam was built really close to bore locations as shown in this picture