Showing posts with label 7-11-2017. Show all posts
Showing posts with label 7-11-2017. Show all posts

Tuesday, July 11, 2017

Site visit, Poured Bent 3 Wall

 Contractor was ready to pour Bent 3 Wall
 Concrete arrived at 8:57, I tested concrete: Slump 2 1/2", Air 5%, Temp 79°



 Finished pouring and headed back at 11:10