3368 Cedar Co Bridge
Showing posts with label
7-11-2017
.
Show all posts
Showing posts with label
7-11-2017
.
Show all posts
Tuesday, July 11, 2017
Site visit, Poured Bent 3 Wall
Contractor was ready to pour Bent 3 Wall
Concrete arrived at 8:57, I tested concrete: Slump 2 1/2", Air 5%, Temp 79°
Finished pouring and headed back at 11:10
Older Posts
Home
Subscribe to:
Posts (Atom)