3368 Cedar Co Bridge
Thursday, July 13, 2017
Site visit-Poured Bent 3 & 4 Caps
Contractor was ready to pour Caps for both Bents 3 and 4
Concrete arrived at 8:05, I tested concrete: Slump 4 1/2", Air 5.5%, Temp 80°, I made four cylinders.
Finished pour at 9:20, pour went good.